Buying structural steel fabrication: a checklist for plant engineers and procurement

What to put in a structural steel enquiry, the standards SA fabrication is built to, and the quality records to ask for before steel leaves the workshop.

Structural steel trusses and columns being trial-assembled in a fabrication yard, fitter checking dimensions with a tape against a shop drawing
Representative image

A structural steel package is quoted, fabricated and erected from the information in the enquiry. Most of the cost and programme risk on a steel job comes from gaps in that information, not from the fabrication itself. This checklist is written for the plant engineer or buyer putting a package out to tender.

1. Send drawings that define the job

  • General arrangement drawings with member sizes and grades
  • Connection design or a clear statement of who designs the connections
  • Whether the fabricator must produce shop drawings and who approves them
  • A bill of materials if one exists. Check its tonnage against the drawings.

2. State the standards

In South Africa, structural steel design typically follows SANS 10162-1, and fabrication and erection are commonly specified through SANS 2001-CS1, the construction standard for structural steelwork. Many plant owners add their own specifications. List them all, with editions, so the tolerances, weld inspection levels and documentation requirements are priced correctly.

3. Define the corrosion protection

Surface preparation grade, coating system, dry film thicknesses and whether galvanising applies. Coating is often a large share of the price and a frequent source of disputes on site.

4. Define inspection and records

Ask for an inspection and test plan (ITP) with hold and witness points. At handover, a complete quality pack normally includes material certificates traceable to the steel, welding procedures and welder qualifications, dimensional records, NDT reports where specified, coating inspection records and a delivery register.

5. Plan the erection interface

If another contractor erects the steel, agree on marking, bolt supply, temporary bracing, delivery sequence and laydown. If one contractor fabricates and erects, a single party owns fit-up problems on site.

6. Estimate tonnage early

Tonnage drives cost, transport and crane selection. Our free steel weight calculator estimates the mass of plate, flat bar and pipe from dimensions for early budgeting.

How Redsafe helps

Redsafe fabricates and installs structural steel for mining, petrochemical, energy and heavy industry, with in-house fabrication and coded welding. On referenced projects, Redsafe has used full workshop test-assembly to eliminate on-site adjustment.

Send us the drawings and an engineer will review the scope before quoting.

T-02 · Free toolSteel weight calculatorWeight of plate, flat bar, round bar and square or rectangular hollow sections from dimensions.
Related capabilities
Keep reading

Related articles.

NDT technician performing phased-array ultrasonic testing on a pipe butt weld, probe on couplant, instrument screen showing a scan
Quality2 min

NDT for welded steel and piping: VT, PT, MT, UT and RT compared

Overhead view of piping isometric drawings on a table with weld numbers highlighted, a calculator, a tape measure and a short pipe offcut
Piping5 min

Diameter-inches explained: how piping contractors measure and price welding

Welding supervisor at a workshop desk marking up piping isometrics with a weld map and a tablet
Fabrication5 min

Estimating welding man-hours for piping and structural steel

Start a project

Send us the scope.

Drawings, a bill of quantities or a description of the problem. An engineer reviews every enquiry and comes back to you directly.

WhatsAppMessage us
BaseKya Sand, Randburg
Call WhatsApp Start a project