Analyzer Unit Turnaround
- Type
- Turnaround
- Programme
- On time
- Safety
- 0 incidents
Heavy-gauge platework, process equipment support grids and structural steel frameworks for a high-corrosion plant, delivered ready for bolt-on installation.
Field modifications required
HSE incidents
Programme
Offsite supply and workshop fabrication.
A high-corrosion live plant where field modification means hot work, permits and risk, and tolerances had to hold with zero deviation.
A zero-onsite-adjustment protocol: precision layout templates and full workshop test-assemblies before shipping, so every component arrived ready for bolt-on integration.
| Environment | High-corrosion process plant |
|---|---|
| Inspection | Multi-stage AIA interventions |
| Method | Full workshop test-assembly before dispatch |
| Disciplines | Structural Steel · Fabrication & Welding · Engineering & Procurement |
| Records | AIA sign-off logs, Quality Control Packs and client verification records available for procurement review |
Drawings, a bill of quantities or a description of the problem. An engineer reviews every enquiry and comes back to you directly.